Applied
Production Overview
Leadership view — plant and shift performance against plan, with waste and downtime context
Units Produced vs Plan by Month
Navy bars = actual good units · orange line = plan
Scrap % and Delay by Month
Teal bars = scrap % · orange line = delay (downtime) hours · tooltip includes average scrap units per shift
Production by Product
Click a bar to cross-filter this page
Output by Line
Click a line to cross-filter · heat strip shows last 14 days of OEE
OEE ≥ 80%72–80%< 72%
Day vs Night Shift Comparison
Units (thousands, left axis) versus scrap % and unplanned downtime hours per shift (right axis)
Day shift runs 6:00 AM–6:00 PM, Night shift 6:00 PM–6:00 AM. Shift close drives the twice-daily production load from MyCon.